The Regular Meeting of the Board of Trustees for the Village of Painted Post was called to order by Mayor Foster at 7:00 PM.
PRESENT: Mayor Foster, Deputy Mayor Manning, Trustee Elsey, Trustee Lecher, Trustee Yama, OIC Copp, Fire Chief Button, DPW Superintendent Smith and Clerk Names.
ABSENT:
MINUTES: of the August 10, 2026 meetings were approved with a motion made by Deputy Mayor Manning and seconded by Trustee Elsey and carried.
POLICE REPORT: August report submitted by OIC Copp as follows:
Traffic Arrests: Total of 9
0Ticket, 7 Warning, 2 MV Accidents, 0 Bicycle and 0 Pedestrian Accidents.
Complaints: Total of 32
1 Felony, 9 Misdemeanors, 7 Violations, 2 Vehicle & Traffic, 0 CPPMS, 1 Animal, 1 Domestic, 6 Local Law Violation, 0 Stolen Property Cases, 5 Found Property Cases, 0 Miscellaneous, 0 Warrant.
Assistance/Services Rendered: Total of 119
9 Citizen/Motorist, 6 AMR., 1 PP Fire Dept., 1 E.I.D. Alarms, 0 Missing Persons, 0 Open Door, 1 Mental Health Transports, 6 Check the Welfare, 83 Vacation Property Checks, 8 Steuben Co. Sheriff, 4 NY State Police, 0 Corning Police, 0 Other Police Agencies, 0 DA Office, 0 Dept. of Pubic/Works, 0 US Government, 0 Other agencies.
Parking Tickets: Total of: 51
45 for 12am to 6am Parking Enforcement, 6 Other and 0 Parking Complaints.
Total Calls for Service: 160
5N01 MILEAGE: 470 Miles
5N02 MILEAGE: 475 Miles
5N01 Repairs – Brakes/Oil Change/Water Pump/Radiator/Towed
FIRE DEPT.
REPORT: August submitted by Fire Chief Smith as follows:
Total number of calls for the month was 385
0 False Alarms, 1 MVA/Rescues, 5 Service Calls, 1 Vehicle Fires, 0 Searches, 0 Chimney Fires, 1 Structure Fires, 0 Grass/Brush/Wood Fires, 0 Hazardous Conditions, 0 Vehicles Leaking Gas, 0 Hazmat, 0 Storm/Flooding, 6 C.O./Fire Alarm Activation, 4 Mutual Aid Fire, 0 Mutual Aid MVA, 6 Mutual Aid AMR
Total in Service Hours: 385
Average Fire Fighters Per Call: 13
Training Certifications: 0
In Service Hours to Date: 2658.5
Total Number of Calls to date for the Year –177
No major repairs to the Fire equipment and no reported injuries.
Chief 2800 –J. Button responded to 79% of the calls for the month.
Chief 2801 –L. Smith responded to 100% of the calls for the month.
Chief 2802 –D. Smith responded to 96% of the calls for the month.
Fuel Usage: Gas – 143.3 gallons Diesel – 35.5 gallons
Department monthly training consisted of alternative suppression equipment and operation.
Department participated in a joint training session at Sullivan Park with FVGM and CPLA Fire Departments.
Department performed monthly apparatus and equipment checks.
Mandatory hydrostatic testing of SCBA cylinders completed.
Department approved two new firefighter applications for membership
DPW REPORT: August 2026 report submitted by Superintendent Smith as follows:
Water Treatment and Distribution System
Water levels at wells are at: Well # 2 – 43, Well # 3 – 26’ & Well # 4 – 42’of water above the pump.
Water service at 145 and 149 Fairview turned off as requested by owner.
Water service at 577 W. High turned off. Owner making inside repairs.
Crew flushed water service 440 West High Street.
Crew repaired a 2.5” galvanized water service at 165 Charles St. (Board of Ed)
Crew repaired an 8” watermain break at the intersection of E. High and Jerome.
Crew with the assistance of the NYSDOT repaved the water trench at the intersection of Buffalo and Pulteney.
Sanitary Sewer Treatment and Collection System
Crew continued sludge pressing operations at the WWTP.
Crew completed monthly sanitary sewer jet cleaning.
Crew jet cleaned upper section of Fairview Ave. (106/107 Fairview)
Construction of the disinfection project at the WWTP is substantially complete.
Crew replaced seal water lines at the WWTP
Crew repaired belt filter press at the WWTP
Village Streets and Walkways
Crew swept streets on several occasions.
Crew along with the Town of Erwin Highway mowed shoulders along West Hill Road.
Crew trimmed and removed trees throughout the Village.
Crew repaired and set out pedestrian crossing signs.
Crew installed under drain piping on West Hill Road at the lower terrace entrance.
Buildings and Grounds
Crew hauled weekly trash from Village facilities.
Crew continued weekly pickup of yard waste.
Crew performed weekly equipment safety checks.
Crew completed monthly playground equipment inspections.
Water at Dog Park turned on.
Crew continued mowing and trimming operations
Crew cleaned pavilion for rental on nine occasions.
Crew weeded flower beds and planters.
Crew painted over graffiti on tunnel concrete walls.
Repaired toilets at Craig Park Pavilion.
Equipment Maintenance
Performed maintenance and repairs on DPW, FD and PD equipment.
Serviced, repaired and cleaned equipment.
Village Cemeteries
Five burials for the month.
Water turned on at both cemeteries.
Crew continued mowing and trimming operations.
Village DPW
Crew continues additional services for the Village of Riverside.
Continued weekly safety meetings.
Village was awarded a grant from PERMA for safety equipment. ($2,500)
NYSDEC conducted a compliance inspection of the diesel storage facility located at the WTP.
Village was awarded a Local Government Records Management grant. ($14,853 for cemetery records)
FINANCIAL/
BUDGET REPORT: No Changes
CLERKS REORT: All checkbooks for August have been reconciled and balanced to our accounting program and the bank statements. Monthly reports have been provided to the mayor, board members and department heads.
We have collected $1,797,478.02 in taxes and penalties as of 8/31/2026. We currently have 36 properties that are unpaid. The total amount currently owed including penalties is $83,006.94.
Late notices for approximately 160 water/sewer bills were processed and sent out on August 28, 2026.
I completed and submitted the NYS Annual Financial Report for the 2025-2026 fiscal year.
Pam collected and processed approximately 35+ parking tickets.
Several tax searches were completed.
PLANNING BOARD: No August Planning Board meeting was held.
OLD BUSINESS: None
NEW BUSINESS: 1. Village Board of Trustees approved the Inter Municipal Agreement (IMA) between the Town of Corning and the Village of Painted Post to supply Code Enforcement services to the Village of Painted Post beginning October 1, 2026 through December 31, 2026 for a fee of $1,250.00 per month. This agreement will be revisited as of January 2027.
Motion to approve was made by Deputy Mayor Maning, seconded by Trustee Lecher and carried.
2. The October meeting will be held on Tuesday, October 13, 2026 due to Monday being
Columbus Day and the office being closed,
3. The Village of Painted Post Board of Trustees approved Halloween “Trick or Treating” for Saturday, October 31, 2026 from 6:00pm to 8:00pm.
The Town of Erwin will hold their Trick or Treating from 5:00pm to 8:00pm
Motion to approve was made by Trustee Elsey 2nd by Trustee Yama and carried.
4. The Village Board approved Christine Adamo as a permanent member of the Planning Board as Travis Gasa will be moving out of the area and must resign.
Motion to approve was made by Trustee Elsey, 2nd by Trustee Lecher and carried.
SUSPEND ORDER
OF BUSINESS: Motion made by Deputy Mayor Manning, 2nd by Trustee Yama and carried.
PUBLIC
COMMENTS: Marie and Michael McCaig of 120 Grace Blvd. reiterated their continuing concerns with regards to the motorhome that is parked at 108 Grace Blvd and insisted that the Mayor go speak to the owners of the motorhome in question.
Patti Pickles of 362 Delaware voiced her concern with the property conditions at 209 E. High St.
RESUME ORDER
OF BUSINESS: Motion made by Trustee Elsey and 2nd by Trustee Lecher and carried.
TRUSTEE
COMMENTS: Trustee Yama asked if there was any action plan for the disposal of the old fire trucks. He also asked if when Siemens fire tone goes off, if Gang Mills is notified. Superintendent/Fire Chief Smith said it did not. Trustee Yama also stated that our current law on storage needs to be changed/updated.
Trustee Lecher stated that our code enforcement officer would be changing and that we needed to bring our Village Codes up to standards.
Trustee Elsey stated that when issues with our current codes come up they should be looked at and addressed.
Deputy Mayor Manning also agreed that should be updated. He also stated that the Halloween parade would either be on October 22nd or 29th this year.
AUTHORIZATION: to pay audited bills for the Village on a motion made by Deputy Mayor Manning, seconded by Trustee Lecher and passed.
Abstract #5 (Aug.) Voucher No. Abstract #6 (Sept.) Voucher No.
General Fund: $ 4,199.26 118-124 $ 48,030.13 125 -165
Water Fund: $ 176.08 61- 64 $ 7,702.08 65 – 90
Sewer Fund: $ 323.72 61- 62 $ 15,021.86 65 – 88
TOTALS: $ 4,699.06 $ 70,754.07
GRAND TOTAL: $ 75,453.13
A motion to adjourn was made by Trustee Elsey and seconded by Deputy Mayor Manning at 7:42 pm
and carried.
Respectfully submitted by Anne Names, Clerk-Treasurer
